News Ticker

EnviroEcoWall buildings gain KIWA certification

EnviroEcoWall is proud to announce that, following several years of rigorous testing and assessment, its fire-resistant insulated buildings have been granted certification by KIWA, a leading independent quality assurance organisation. This certification reaffirms EnviroEcoWall’s commitment to providing high-quality, safe, and innovative building solutions to its customers.

Introducing Enviro Eco – Buildings

Because this is an entirely new way of building, it has taken four years to get certification to be able to put these buildings on the market but we have, at last, achieved certification.

EnviroEcoWall Panels have developed various buildings, from garden offices, bungalows and houses to a block of flats and, no matter what happens in any of them, they will never catch fire.

During development a fully furnished two-storey house was built and tested on four separate occasions by starting one fire in a first-floor bedroom and a second fire in the ground floor living room.  On each occasion Architects, Engineers and Council officials were able to walk around the house whilst it was on fire, touching doors and walls, until eventually the fires self-extinguished.  Then, all the burnt furniture and plasterboard on the walls and ceilings was removed.  Four hours later, with new panels fitted, the room redecorated and all electrics working, the house was ready for reoccupation and there was no smell of fire.

The main advantages of our buildings are:

  • They can never flood or burn down – they are completely fireproof
  • They have thermally insulated floors and walls
  • They have been stringently tested for air tightness and sound insulation

In addition, they can be built extremely quickly.  A bungalow can be erected and made ready for occupation in as little as four days and a two-storey house in five to six days.

As the need for affordable housing becomes ever greater, this unique system combines structure and insulation into one prefabricated, thermally efficient component.  The system further suits today’s conditions as the strict quality control during the off-site fabrication process ensures dimensional accuracy, helps to reduce build time and minimises waste on site.

For more details call 01227 286410 or email sales@enviroecowallpanels.com

See one of the house fire tests here