News Ticker

George Smith powers ahead with solar – as new system goes live with AR Power

Luxury furniture maker George Smith is now reaping the benefits of solar energy, following the successful installation of a 176.4 kWp solar PV system by North East-based commercial solar specialists, AR Power.

The collaboration between the two respected businesses has seen 392 solar panels installed on the roof of George Smith’s Cramlington manufacturing site – a move that is already driving down energy bills and significantly reducing the company’s carbon footprint.

Designed and installed entirely by AR Power’s in-house team, the system is now live and generating clean electricity on-site, producing an estimated 167,355 kWh per year and cutting CO₂e emissions by more than 37 tonnes annually.

The project supports George Smith’s long-term sustainability strategy, aligning with their commitment to responsible sourcing, waste reduction, and more energy-efficient operations. Known globally for its handcrafted upholstered furniture, the company is combining traditional British craftsmanship with cutting-edge renewable technology – showing how heritage and innovation can go hand-in-hand.

AR Power ensured the commercial solar installation was carried out with minimal disruption to George Smith’s operations. Safety and efficiency were prioritised throughout the process ensuring full compliance with CDM requirements. To keep everyone safe on site, AR Power ensured scaffolding was put in place along with a Haki staircase for roof access, using a 17m telehandler to lift equipment to the roof. Additionally – as a part of the scope of work – AR Power managed and coordinated the installation of permanent roof access and fall restraint systems to make future maintenance safer and more cost-effective. The solar system, built using SolarEdge technology, meets all RC62 fire safety recommendations and includes a firefighter gateway, system isolation switch.

Stephen Armstrong, Head of Commercial at AR Power, commented:

“It’s fantastic to see the system up and running, already delivering energy savings for George Smith. From the outset, their team was engaged, clear in their objectives, and a pleasure to work with. Our project manager worked closely with them throughout to ensure expectations were met at every stage – and we’re proud to have completed the installation on time, with no disruption to their day-to-day operations.”

Jim Athey, UK Managing Director at George Smith, added:

“This installation marks a major milestone in our journey towards greater sustainability – something that is incredibly important to us as a business. The AR Power team made the whole process incredibly smooth – clear communication, minimal disruption, and a very neat and efficient job delivered on time.

“AR Power have a strong track record of delivering large, complex projects to the highest standards. That reputation, combined with their upfront and proactive approach to health and safety (particularly important for any roof work) helped build trust and made them the clear choice.

“So far, the system is exceeding expectations. We’re already seeing the benefits in terms of energy savings and reduced costs. It’s a smart investment for our future and another step towards becoming a more environmentally responsible business.”

The project adds to a suite of sustainability measures already in place at George Smith’s factory, including LED lighting upgrades, investment in energy-efficient machinery, and improved recycling systems.